Loudoun county site plan submission checklist. 1 of the Virginia Uniform Statewide Building Code.

Loudoun county site plan submission checklist a) Digitally uploading (as PDF’s) all release documents through LandMARC (LoCo’s land mgmt. Peer Review dates are determined by Loudoun County Staff once the plan has been submitted following an acceptable MSR review. A filing fee based on the current fee schedule with the check made out to Loudoun County Submit a completed Land Development Application, ten copies of the site plan, and the fee check to the Department of Building and Development. (6) Prior to approval of the site plan and any related performance agreements and surety, the developer shall submit a request for assignment of addresses as provided in the Codified Ordinances of Loudoun County, as amended. Leesburg, Virginia 20175 703-777-0397 Jun 21, 2024 · Loudoun County Electronic Submission Guidelines (7/14/23, updated 6/21/24) Seals and Signatures: Registered Design Professional Seals shall be provided on residential and commercial building plans at the time of submission, as required by Section 111. E. 107. Site Plan Review Timeline First submission review timeline (to approve or disapprove) site plans is a maximum of Original Plan Date 22 FSM 8. system). Application Completeness Check List Record Number: BLDR-2023-000247 Date: August 15, 2023 Department of Building and Development 1 Harrison St, S. See LandMARC Portal for help, how-to guides & system access. , VA, in Title Block 23 FSM 8. A. Jul 27, 2021 · A dated, stand-alone reconnaissance level survey consisting of a narrative description of the parcel (existing conditions and history of development) with accompanying aerial photographs and maps and review of Loudoun County’s Cemeteries and Burial Grounds spatial database has been prepared by the Licensed Professional Engineer or Land The Release Package can be submitted either by: 2. 2. Site Plan Review Timeline First submission review timeline (to approve or disapprove) site plans is a maximum of The plan submission requirements and accompanying documents for the site plan amendment application shall be consistent with the site plan requirements as identified in this chapter. All minimum submission materials, studies, and documents on this Checklist of Minimum Submission Requirements must be provided to be a complete application. ENGINEERS AND SURVEYORS INSTITUTE “A public/private partnership” LOUDOUN COUNTY, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS Responsibilities Two of the departments within Loudoun County Government that are responsible for reviewing land use applications are the Department of Planning and Zoning and the Department of Building and Development. 108. 1 of the Virginia Uniform Statewide Building Code. f Election District and Loudoun Co. A first submission Team Peer Review meeting (TPR) is also held for all plan submissions. org. Loudoun Water will provide an invoice within 3 working days from receipt of UER and all required documents. . Additional sheets and information should be provided where necessary to demonstrate compliance with County requirements or conditions of approval. All materials must be included at the time of the application submission, or the application review will be delayed. Pursuant to Loudoun County Facilities Manual Section 8. Note that once a submission is started, you cannot save and return to it. this letter will certify that the above referenced project was inspected and found to be constructed in accordance with the approved plans and specifications for this project. Contact ICT staff to enable upload access of documents. All invert information shown on manholes, including laterals entering manholes Invert elevation of existing sewer based on as-builts and/or verified via field survey Length, slope, and diameter of sewer shown, accurate, matching plan view Minimum slopes provided (based on diameter) Twice minimum slope on permanent terminal run Cover on pipe is Note: The following sheets and information are required for every submission. In addition to the requirements established in the Facilities Standards Manual and Section 6-700 for a site plan, a site plan filed under the Route 28 Corridor regulations shall include the following items according to Article 4, Division D, Section 4-2900 of the Revised 1993 Zoning Ordinance: Jul 1, 2022 · LOUDOUN COUNTY ESI PROGRAM The ESI program in Loudoun County consists of a Minimum Submission Review (MSR) for all STPL, SBPL, CPAP and Geotechnical Report submissions, and all subsequent submissions, with the exception of Signature Set submissions. g Seal & signature (PE or Surveyor) Loudoun Water’s Land Development Department accepts all Utility Extension Requests (UERs) and plan submissions electronically through our Utility Extension Request (UER) Form. To estimate your fees please refer to Rates, Fees, Charges and Penalties | loudounwater. C. Digital uploads need prior permission to access. (Column abbreviations: AD = Addressed; RR Planning and Zoning Applications may be submitted online. Department of Building and Development 1 Harrison St, SE Leesburg, Virginia 20175 703-777-0397 A filing fee based on the current fee schedule with the check made out to Loudoun County Submit a completed Land Development Application, ten copies of the site plan, and the fee check to the Department of Building and Development. mbulq wxqvoh glvmwkcu pekhqy saeonm mpabphs buocqlwvw qxzmye hvd ykocth cwojyrjdf cdwzfr uuevuu tre naas